Why might two tenders propose different kinds of lime for the same wall?

Two different lime proposals may reflect different assumptions about the job. Find those differences before choosing by binder label or price.

Call 01623 579297

Illustrative loose sand and aggregate samples beside a lime-render sample board.

Contractors can propose different kinds of lime because they have interpreted the background, exposure, retained material or programme differently. They may also be pricing different extents of work. The useful response is to compare complete proposals against one agreed description of the wall, then ask the responsible specifier to resolve the technical differences. A higher strength class or a shorter programme is not, on its own, evidence of a better repair.

Check that both tenders describe the same operation

Read the scope before the material list. Does one tender repair local failures while the other removes and replaces the whole elevation? Does one retain an existing base while the other assumes exposed masonry? If those starting points differ, a binder comparison is premature. Each proposal may be answering a different question.

Make a common description of the work using the available survey, marked photographs and known repair boundaries. Identify any areas that have not been inspected. Give both tenderers the same clarification and ask them to state their assumptions against it. Avoid quietly improving one proposal with information that the other has never received.

Where the extent remains uncertain, commission the investigation needed to settle it or ask for clearly separated provisional work. A tender should distinguish what is defined from what depends on opening up. This makes it possible to understand the material recommendation without pretending the concealed wall has already been examined.

Translate the binder description into a complete product identity

SPAB distinguishes non-hydraulic lime, which hardens by carbonation, from natural hydraulic lime, which also sets through reactions involving water. Those differences matter to specification, but neither description identifies the complete repair mortar. Ask for the binder or premixed product reference and the supporting documents, rather than comparing the word lime in one proposal with an NHL class in another.

The term hydrated can also confuse the comparison. Lime Green explains that hydration describes water added during manufacture; it is not a simple synonym for non-hydraulic. Ask the tenderer to clarify the actual product intended if the wording is ambiguous.

For a proprietary render, obtain the precise base and finishing products and their application guidance. For a designed site mix, obtain the specification identifying the binder, aggregate and other intended constituents. The quotation should identify the proposed mix or named system clearly enough for its technical documents to be checked.

Ask what each proposal assumes about the wall

Historic Environment Scotland identifies the purpose of the mortar, existing materials and exposure among the factors in selection. Ask each tenderer to connect its recommendation to the observations available for this project. The answer should refer to the wall, not simply to a habit of using one material on every older building.

For example, one proposal may assume a weak retained render while another assumes that it will be removed. Another difference may concern an exposed parapet rather than the main elevation. These are reasons to reconcile the scope and assessment, not proof that either binder is inherently right or wrong.

If a recommendation rests on a condition that has not been observed, identify the check needed. A town's climate average or the building's approximate age cannot replace examination of the actual background and detail. Keep wider context in its proper place while asking for the project-specific basis of selection.

Illustrative older lime-rendered wall with a small area of worn surface and retained surround.

Compare layers, aggregate and finish alongside the lime

A material change can affect more than the first coat. Put the background treatment, main layers, finish and decoration beside each other. Include any proposed reinforcement or carrier and ask what problem it is intended to address. The proposal should explain how the layers form the specified construction.

Consider a hypothetical pair of tenders: one names a non-hydraulic repair mortar and retains the surrounding finish; another names an NHL-based proprietary system and includes wider replacement. The useful comparison is not a vote between the two binder labels. First establish whether the wider removal is justified, then compare the appropriate complete options for the agreed extent.

If aggregate or finish samples are proposed, ask what each sample will demonstrate. A surface match may help appearance decisions while leaving the binder choice unresolved. Keep the technical acceptance and visual acceptance separate enough that neither is mistaken for evidence of the other.

Tender clarification sheet; questions, not a product ranking
ItemTender ATender BClarification needed
Retained backgroundState the assumed material and extentState the assumed material and extentAre both based on the same survey?
Render build-upIdentify each specified layerIdentify each specified layerDo the layers address the same repair?
Aggregate and finishProvide reference and sample proposalProvide reference and sample proposalWhat will be judged on the sample?
Protection and sequenceDescribe required conditions and checksDescribe required conditions and checksDoes the programme follow the chosen material?
Unknown repairsSeparate provisional workSeparate provisional workHow will discoveries be agreed?

Find out whether the programme is driving the material choice

Ask the tenderer to explain the application and aftercare sequence for the specified products. Identify the inspection points and the arrangement for weather interruptions. A proposed completion date should be supported by the system requirements and actual work conditions rather than assumed to establish them.

Lime Green's FAQ says that the interval before its finish coat depends on product, thickness and weather. It does not support one fixed waiting time for every lime render. Use the relevant current documents and project advice when comparing programmes, and keep any assumptions about protection explicit.

If an alternative is proposed to shorten the job, have the specifier assess it as a material change. Include any effect on preparation, other layers, appearance and maintenance. The owner can then judge the revised programme and price knowing what is changing, instead of accepting a faster schedule with an unexplained substitution hidden inside it.

Resolve technical differences before accepting the price

Send a concise clarification request listing the material differences and the evidence each tenderer should address. Ask the appointed designer or appropriately experienced adviser to review the responses. Where manufacturer advice is relevant, retain it with the specific product and background to which it applies.

Once an option is technically accepted, check its commercial scope. Access, trials, protection, removal, repairs and decoration should all have a stated place. Identify work supplied by others and any exclusions that leave a real gap. A lower total may reflect a smaller operation rather than a cheaper way to deliver the same specification.

Keep the accepted tender and clarifications together. If an important answer remains only in a call, confirm it in writing before ordering. The final agreement should be usable by the people on site, including anyone who was not involved in the original quotation conversation.

Check the quantities as well as the descriptions. Establish whether openings, returns and small adjoining panels have been included in the measured area or priced separately. This is a commercial comparison task after the technical scope is settled; it prevents apparently different rates from concealing different measurement assumptions.

Keep substitutions subject to the same test

A stock shortage or revised repair extent can reopen the material question during the job. Require the proposed alternative to be identified and assessed against the accepted specification. State whether a new sample, revised preparation or further approval is needed. A similar colour or familiar brand does not establish interchangeability.

Record the approved change and where it was used. Keep the material references with the maintenance information so a future repairer knows what is on the wall. If different elevations use different specifications, make that distinction clear rather than listing one generic lime product for the whole building.

For a Nottinghamshire enquiry, have both proposals, the survey and photographs available when calling 01623 579297. Explain the exact difference you want clarified. The lime-rendering homepage and specialist guides can help organise the questions, while the final material decision remains tied to the assessed building.

Questions and answers

Should I always choose the lower NHL class for an old wall?

No class should be chosen from age alone. The existing materials, repair purpose and proposed construction need assessment. Ask for the reasons behind the complete specification and resolve any uncertainty about the background.

Can two different specifications both be reasonable?

Potentially, if each addresses the actual building and agreed scope with suitable evidence. The comparison should identify the practical differences, limitations and maintenance implications rather than force a winner from a binder label alone.